- Construction must begin within five years and complete it within 36 months.
- Four Creeks must all access to the site for inspection by the County or its contractors.
- The company must notify County and Township officials within seven days of the project reaching its commercial operation date, and provide final plans, maps and legal descriptions.
- The Special Use Permit shall expire 40 years from the commercial operation date.
- Construction, operation and decommissioning of the project shall comply with all federal, state and local laws/regulations now or hereafter in effect.
- Construction and maintenance hours shall be 7 a.m.-8 p.m. Monday-Friday from September 1-May 31; 7 a.m.-9 p.m. Monday-Friday from June 1-August 31; 7 a.m.-4 p.m. on any Saturday; and no construction work shall be performed on Sunday.
- The company shall enter into necessary road agreements with all applicable road authorities before applying for any building permit.
- Four Creeks must comply with all County requirement to avoid conflicts with school-bus traffic, agricultural traffic and other vehicular traffic in the project area.
- The project’s turbines must use specified low-noise blades, noise-reduced operating mode and sound-optimized mode as set by the Illinois Pollution Control Board, and provide the County with updated sound and shadow-flicker modeling at least 30 days before applying for a building permit. The shadow-flicker plan must show that all nonparticipating residences and occupied community buildings will receive less than 30 hours of shadow flicker per year; a post-construction sound study must demonstrate adequate limitations during nighttime hours; and the company must performing needed repairs or changes to address any exceedances within two weeks.
- Four Creeks shall provide soil-erosion prevention and remediation measures as required by the County.
- With a few exceptions, the Special Use Permit shall not be assignable without County Board approval.
- Before any building permit is issued, the company must provide a dust-mitigation plan.
- Before applying for a building permit, Four Creeks must detail planned curtailment for any turbine that will cause or contribute to shadow flicker of more than 30 hours on any nonparticipating residence or occupied community building, and provide relevant shadow-flicker data for any such property within one mile of a turbine.
- After the commercial operation date, the company shall advise the County of any turbine that becomes inoperable for a period greater than seven days.
- The company shall drive throughout the project daily, except weekends and holidays to inspect the project to ensure it’s free of trash, weeds, etc.
- Prior to the issuance of a building permit, Four Creeks shall provide proof to the County that it has requested authorization from all required federal authorities to construct and operate an Aircraft Detection Lighting System.
- Prior to the issuance of a building permit, Four Creek shall obtain a “Determination of No Hazard” designation from the Federal Aviation Administration.
- All power lines to collect power from turbines and all communication lines shall be buried underground in compliance with the Agricultural Mitigation Agreement.
- To protect groundwater, private wells and public water supplies within the project area, the County shall have the authority to reasonably regulate the withdrawal, use, manufacture, transportation, discharges, storage or disposal of water and wastewater tied to the use of concrete with the Special Use.
Peoria County gives wind farm green light, with conditions
- The company and its contractors shall share emergency-response plans with local fire and emergency-response agencies.
- Four Creeks shall work with pipeline, water and other utilities to ensure that the integrity of those lines continues through construction and operation.
- If during construction, operation, maintenance and decommissioning, the County retains outside employees to inspect, enforce and ensure compliance, the project shall reimburse the County.
- By applying for a building permit, the company thereby wives any objections to these conditions.
- Before applying for a building permit, the company shall negotiate and enter a Decommissioning agreement, including costs to the County, a cost estimate, review of the terms every five years, and at least a 3% annual increase to cover inflation.
- The company shall comply will all Illinois Department of Natural Resources and U.S. Fish & Wildlife requirements pertaining to birds, bats and other wildlife and the environment.
- If the County deems it necessary to increase law enforcement or private security during construction, the company will reimburse the County for those costs.
- Four Creeks will consult and coordinate with affected landowners, agricultural operators and aerial operators about aerial activities withing the project area.
- The company shall comply with reasonable requests from the National Weather Service to curtail or cease operations during adverse weather.
- The company shall provides reasonably requested proof of compliance with the ordinance, these conditions and any law or regulation.
- These conditions are in addition to and not in lieu of requirements of the ordinance or applicable laws or regulations.
- The placement or use of battery/energy storage systems in association with the project is prohibited.
- Before issuance of a building permit, the company will provide a Memo of Understanding with the State Historic Preservation Office to assess potential impacts on historic sites.
- The company and its owners shall register with the Illinois Secretary of State as a corporation with a registered agent.
- The sole venue to resolves any litigated dispute shall be in the state courts of Peoria County and the state’s appellate courts.
- Before a building permit is issued, the company shall provide documentation demonstrating proof of compliance with all applicable laws, regulations, ordinances and conditions for violation of any law, regulation, provisions of the ordinance or these conditions.
- The Special Use Permit and any building permit subject to these conditions may be revoked or subject to any other remedy